Search results

1 – 10 of 21
Article
Publication date: 21 June 2013

Ala Al‐Fuqaha, Mohammed Elbes and Ammar Rayes

Outdoor localization is an important issue for many applications, such as autonomous mobile robotics and augmented reality. The purpose of this paper is to propose a budgeted…

Abstract

Purpose

Outdoor localization is an important issue for many applications, such as autonomous mobile robotics and augmented reality. The purpose of this paper is to propose a budgeted dynamic exclusion heuristic based on signal phase shifts from multiple base stations.

Design/methodology/approach

The authors also propose an outdoor localization technique based on the particle filter for data fusion and present an overview of a potential target application of the proposed outdoor localization approach for the blind and visually impaired (BVI).

Findings

The combination of multiple sensor data tends to overcome the drawbacks of using one sensor technology in the localization process.

Originality/value

The novelty of the proposed approach stems from its ability to fuse data collected from different sensor technologies to converge to more accurate position estimation.

Details

International Journal of Pervasive Computing and Communications, vol. 9 no. 2
Type: Research Article
ISSN: 1742-7371

Keywords

Article
Publication date: 29 May 2020

Lihui Zhang, Guyu Dai, Xin Zou and Jianxun Qi

Interrupting work continuity provides a way to improve some project performance, but unexpected and harmful interruptions may impede the implementation. This paper aims to…

Abstract

Purpose

Interrupting work continuity provides a way to improve some project performance, but unexpected and harmful interruptions may impede the implementation. This paper aims to mitigate the negative impact caused by work continuity uncertainty based on the notion of robustness.

Design/methodology/approach

This paper develops a float-based robustness measurement method for the work continuity uncertainty in repetitive projects. A multi-objective optimization model is formulated to generate a schedule that achieves a balance between crew numbers and robustness. This model is solved using two modules: optimization module and decision-making module. The Monte Carlo simulation is designed to validate the effectiveness of the generated schedule.

Findings

The results confirmed that it is necessary to consider the robustness as an essential factor when scheduling a repetitive project with uncertainty. Project managers may develop a schedule that is subject to delays if they only make decisions according to the results of the deadline satisfaction problem. The Monte Carlo simulation validated that an appropriate way to measure robustness is conducive to generating a schedule that can avoid unnecessary delay, compared to the schedule generated by the traditional model.

Originality/value

Available studies assume that the work continuity is constant, but it cannot always be maintained when affected by uncertainty. This paper regards the work continuity as a new type of uncertainty factor and investigates how to mitigate its negative effects. The proposed float-based robustness measurement can measure the ability of a schedule to absorb unpredictable and harmful interruptions, and the proposed multi-objective scheduling model provides a way to incorporate the uncertainty into a schedule.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 March 2021

Xin Zou, Lihui Zhang and Qian Zhang

The purpose of this research is to develop a time-cost optimization model to schedule repetitive projects while considering limited resource availability.

Abstract

Purpose

The purpose of this research is to develop a time-cost optimization model to schedule repetitive projects while considering limited resource availability.

Design/methodology/approach

The model is based on the constraint programming (CP) framework; it integrates multiple scheduling characteristics of repetitive activities such as continuous or fragmented execution, atypical activities and coexistence of different modes in an activity. To improve project performance while avoiding inefficient hiring and firing conditions, the strategy of bidirectional acceleration is presented and implemented, which requires keeping regular changes in the execution modes between successive subactivities in the same activity.

Findings

Two case studies involving a real residential building construction project and a hotel refurbishing project are used to demonstrate the application of the proposed model based on four different scenarios. The results show that (1) the CP model has great advantages in terms of solving speed and solution quality than its equivalent mathematical model, (2) higher project performance can be obtained compared to using previously developed models and (3) the model can be easily replicated or even modified to enable multicrew implementation.

Originality/value

The original contribution of this research is presenting a novel CP-based repetitive scheduling optimization model to solve the multimode resource-constrained time-cost tradeoff problem of repetitive projects. The model has the capability of minimizing the project total cost that is composed of direct costs, indirect costs, early completion incentives and late completion penalties.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 May 2016

Emad Elbeltagi, Mohammed Ammar, Haytham Sanad and Moustafa Kassab

Developing an optimized project schedule that considers all decision criteria represents a challenge for project managers. The purpose of this paper is to provide a…

1840

Abstract

Purpose

Developing an optimized project schedule that considers all decision criteria represents a challenge for project managers. The purpose of this paper is to provide a multi-objectives overall optimization model for project scheduling considering time, cost, resources, and cash flow. This development aims to overcome the limitations of optimizing each objective at once resulting of non-overall optimized schedule.

Design/methodology/approach

In this paper, a multi-objectives overall optimization model for project scheduling is developed using particle swarm optimization with a new evolutionary strategy based on the compromise solution of the Pareto-front. This model optimizes the most important decisions that affect a given project including: time, cost, resources, and cash flow. The study assumes each activity has different execution methods accompanied by different time, cost, cost distribution pattern, and multiple resource utilization schemes.

Findings

Applying the developed model to schedule a real-life case study project proves that the proposed model is valid in modeling real-life construction projects and gives important results for schedulers and project managers. The proposed model is expected to help construction managers and decision makers in successfully completing the project on time and reduced budget by utilizing the available information and resources.

Originality/value

The paper presented a novel model that has four main characteristics: it produces an optimized schedule considering time, cost, resources, and cash flow simultaneously; it incorporates a powerful particle swarm optimization technique to search for the optimum schedule; it applies multi-objectives optimization rather than single-objective and it uses a unique Pareto-compromise solution to drive the fitness calculations of the evolutionary process.

Details

Engineering, Construction and Architectural Management, vol. 23 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 March 2019

Lucian Constantin Ungureanu, Timo Hartmann and Ion Serbanoiu

The line of balance (LOB) method is a suitable scheduling technique that managers can use to support lean planning efforts for projects composed of repetitive activities such as…

Abstract

Purpose

The line of balance (LOB) method is a suitable scheduling technique that managers can use to support lean planning efforts for projects composed of repetitive activities such as high-rise building construction. Like any other method, LOB has certain disadvantages that create a set of practical limitations in its application. An LOB schedule gives insights about how continuous and synchronized single resources are scheduled and how uniform these resources are distributed over the project duration. However, these three characteristics have to be visually checked, which makes the evaluation and the comparison of different schedule alternatives difficult. To overcome this problem, the purpose of this paper is to present a quantitative method to calculate quality degrees for the continuity, the synchronization and the uniformity of an LOB schedule that can be applied to assess an LOB schedule globally.

Design/methodology/approach

The paper introduces a set of global indicators, termed quality degrees, which allow for a quick quantitative evaluation of LOB schedules at the global level. These quality degrees are quantitative indicators for the: degree of continuity, degree of synchronization and degree of uniformity within a specific LOB alternative. A mathematical model was developed to calculate the quality degrees for LOB schedules. This model was validated using a well-known case study extracted from literature, and its practical implementation was exemplified on two real Romanian projects.

Findings

The paper illustrates this contribution using two case studies that confirm that the proposed method can be used to evaluate different schedule alternatives. In particular, the paper shows that quality indicators can be used to analyze and control interdependencies between cost and time.

Research limitations/implications

The main limitation of the proposed method is that it cannot indicate the desired level of continuity, synchronization or uniformity to be achieved. Further studies need to explore this possibility, as well the relationship between indicators.

Practical implications

The presented quality indicators contribute to existing LOB methods as they allow for the quick analysis and assessment of schedules without an in-depth visual analysis.

Originality/value

The paper proposes an innovative method, mathematically formulated, to quantitatively assess the quality aspects of continuity, synchronization and uniformity for LOB schedules.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 August 2020

Mohammadjavad Arabpour Roghabadi and Osama Moselhi

The purpose of this paper is to identify optimum crew formations at unit execution level of repetitive projects that minimize project duration, project cost, crew work…

Abstract

Purpose

The purpose of this paper is to identify optimum crew formations at unit execution level of repetitive projects that minimize project duration, project cost, crew work interruptions and interruption costs, simultaneously.

Design/methodology/approach

The model consists of four modules. The first module quantifies uncertainties associated with the crew productivity rate and quantity of work using the fuzzy set theory. The second module identifies feasible boundaries for activity relaxation. The third module computes direct cost, indirect cost and interruption costs, including idle crew cost as well as mobilization and demobilization costs. The fourth module identifies near-optimum crew formation using a newly developed multi-objective optimization model.

Findings

The developed model was able to provide improvements of 0.2, 16.86 and 12.98% for minimization of project cost, crew work interruptions and interruption costs from US$1,505,960, 8.3 days and US$8,300, as recently reported in the literature, to US$1,502,979, 6.9 days and US$7,222, respectively, without impacting the optimized project duration.

Originality/value

The novelty of this paper lies in its activity-relaxation free float that considers the effect of postponing early finish dates of repetitive activities on crew work interruptions. The introduced new float allows for calculating the required crew productivity rate that minimizes crew work interruptions without delaying successor activities and without impacting the optimized project duration. It safeguards against assignment of unnecessary costly resources.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 January 2024

Xin Zou and Zhuang Rong

In repetitive projects, repetition offers more possibilities for activity scheduling at the sub-activity level. However, existing resource-constrained repetitive scheduling…

Abstract

Purpose

In repetitive projects, repetition offers more possibilities for activity scheduling at the sub-activity level. However, existing resource-constrained repetitive scheduling problem (RCRSP) models assume that there is only one sequence in performing the sub-activities of each activity, resulting in an inefficient resource allocation. This paper proposes a novel repetitive scheduling model for solving RCRSP with soft logic.

Design/methodology/approach

In this paper, a constraint programming model is developed to solve the RCRSP using soft logic, aiming at the possible relationship between parallel execution, orderly execution or partial parallel and partial orderly execution of different sub activities of the same activity in repetitive projects. The proposed model integrated crew assignment strategies and allowed continuous or fragmented execution.

Findings

When solving RCRSP, it is necessary to take soft logic into account. If managers only consider the fixed logic between sub-activities, they are likely to develop a delayed schedule. The practicality and effectiveness of the model were verified by a housing project based on eight different scenarios. The results showed that the constraint programming model outperformed its equivalent mathematical model in terms of solving speed and solution quality.

Originality/value

Available studies assume a fixed logic between sub-activities of the same activity in repetitive projects. However, there is no fixed construction sequence between sub-activities for some projects, e.g. hotel renovation projects. Therefore, this paper considers the soft logic relationship between sub-activities and investigates how to make the objective optimal without violating the resource availability constraint.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 February 2019

S.M. Reza Alavipour and David Arditi

Planning for increased contractor profits should start at the time the contract is signed because low profits and lack of profitability are the primary causes of contractor…

Abstract

Purpose

Planning for increased contractor profits should start at the time the contract is signed because low profits and lack of profitability are the primary causes of contractor failure. The purpose of this paper is to propose an integrated profit maximization model (IPMM) that aims for maximum expected profit by using time-cost tradeoff analysis, adjusted start times of activities, minimized financing cost and minimized extension of work schedule beyond the contract duration. This kind of integrated approach was never researched in the past.

Design/methodology/approach

IPMM is programmed into an automated system using MATLAB 2016a. It generates an optimal work schedule that leads to maximum profit by means of time-cost tradeoff analysis considering different activity acceleration/deceleration methods and adjusting the start/finish times of activities. While doing so, IPMM minimizes the contractor’s financing cost by considering combinations of different financing alternatives such as short-term loans, long-term loans and lines of credit. IPMM also considers the impact of extending the project duration on project profit.

Findings

IPMM is tested for different project durations, for the optimality of the solutions, differing activity start/finish times and project financing alternatives. In all cases, contractors can achieve maximum profit by using IPMM.

Research limitations/implications

IPMM considers a deterministic project schedule, whereas stochastic time-cost tradeoff analysis can improve its performance. Resource allocation and resource leveling are not considered in IPMM, but can be incorporated into the model in future research. Finally, the long computational time is a challenge that needs to be overcome in future research.

Practical implications

IPMM is likely to increase profits and improve the chances of contractors to survive and grow compared to their competitors. The practical value of IPMM is that any contractor can and should use IPMM since all the data required to run IPMM is available to the contractor at the time the contract is signed. The contractor who provides information about network logic, schedule data, cost data, contractual terms, and available financing alternatives and their APRs can use an automated IPMM that adjusts activity start times and durations, minimizes financing cost, eliminates or minimizes time extensions, minimizes total cost and maximizes expected profit.

Originality/value

Unlike any prior study that looks into contractors’ profits by considering the impact of only one or two factors at a time, this study presents an IPMM that considers all major factors that affect profits, namely, time-cost tradeoff analysis, adjusted start times of activities, minimized financing cost and minimized extension of work schedule beyond the contract duration.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 4 July 2018

Sameh El-Sayegh

The purpose of this paper is to propose a Non-Linear Integer Programming (NLIP) model that solves the resource leveling problem while reducing the negative effect of the total…

Abstract

Purpose

The purpose of this paper is to propose a Non-Linear Integer Programming (NLIP) model that solves the resource leveling problem while reducing the negative effect of the total float loss on risk.

Design/methodology/approach

An NLIP model is formulated to solve the resource leveling optimization problem incorporating float loss cost (FLC). The proposed model is implemented using “What’s Best solver” for Excel. The FLC is calculated using the float commodity approach. An example is solved using the proposed model in order to illustrate its applicability. Sensitivity analysis is also performed.

Findings

The results confirmed that resource leveling reduces the available float of non-critical activities; decreases schedule flexibility and reduces the probability of project completion. The probability of timely completion dropped from 50 percent (for the normal schedule with 32 resource fluctuations) to 13.5 percent for leveled resources with zero fluctuations. Using the proposed method, the number of resource fluctuations is 8 but the probability of completing the project on time improved to 20 percent.

Practical implications

The proposed model allows project managers to exercise new trade-offs between resource leveling and schedule flexibility which will ultimately improve the chances of successful project delivery.

Originality/value

Resource leveling techniques result in reducing the available total float for the non-critical activities. Existing methods focus on moving noncritical activities within their available float and ignore the impact of the resulting float loss. This reduces the schedule flexibility and increase the risk of project delays. The proposed model incorporates the FLC into the resource leveling optimization problem resulting in more efficient schedules with improved resource utilization while keeping some schedule flexibility.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 December 2021

SeyedReza RazaviAlavi and Simaan AbouRizk

Integrating construction and site layout planning in mechanized tunnel infrastructure projects is essential due to the mutual impacts of construction planning and site layout…

Abstract

Purpose

Integrating construction and site layout planning in mechanized tunnel infrastructure projects is essential due to the mutual impacts of construction planning and site layout decisions. Simulation can incorporate site layout planning and construction planning of tunneling projects in a unified environment. However, simulation adoption by industry practitioners has remained relatively limited due to the special skills required for building and using simulation models. Therefore, this paper aims to create a simple-to-use simulation tool that supports site layout and construction operation planning of tunneling projects. This tool intends to promote the simulation application in site layout planning.

Design/methodology/approach

The current paper proposes simulation as a decision support tool (DST) to provide an integrated environment for modeling tunnel construction operations, site layout and capturing the mutual impacts. A special purpose simulation (SPS) tool was customized and developed for typical mechanized tunneling projects, by tunnel boring machines, to facilitate building the model and allow access to users with limited simulation knowledge.

Findings

The results show that the developed SPS tool is of great assistance to construction industry practitioners to analyze a variety of site layout and construction plan scenarios and make informed decisions based on its comprehensive and intuitive outputs.

Originality/value

The main contribution of this research is to promote simulation application in site layout planning of tunneling projects through the development of a simple-to-use tool, which has sufficient details for site layout planning and constraints. The developed DST enables planners to make decisions simultaneously on the site layout, other construction planning variables and identify the most efficient plan.

Details

Journal of Engineering, Design and Technology , vol. 20 no. 4
Type: Research Article
ISSN: 1726-0531

Keywords

1 – 10 of 21